Factory calendar in maintenance order

Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • #43997 Reply
    Hemanth
    Guest

    When I create a maintenance order, in the header data tab, the calendar selection is “ From work center”, the factory calendar id is blank and disabled. It should be enabled and factory calendar that I have maintained in work center should be populated.

    Please help as why the factory calendar id is disabled and blank, even though I have maintained it in work center and the calendar selection in the order is “ from work center “

    #44362 Reply
    Cleo Isco
    Keymaster

    Please verify your configuration and assignment of the factory calendars.

    If you open a work center (tcode IR03), which factory calendar is maintained on the ‘Capacities’ tab (after clicking on the ‘Capacity’ button)?

Viewing 2 posts - 1 through 2 (of 2 total)
Reply To: Reply #44362 in Factory calendar in maintenance order
Your information:



Your email address will not be published. Required fields are marked *