Calculating duration of an operation

Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • #21550
    Broddo
    Participant

    I want to be able to calculate duration of operations say machine time but this standard value will not be used for costing. I just need to calculate the duration for capacity requirement considerations. How should I approach this, step by step?

    #22991
    Edward T
    Participant

    Hi,

    Technically you can create a work center without assigning any costing in it (cost center/ activity).
    You will not get planned costs and actual costs when you perform production cycle and creation the settlement.

Viewing 2 posts - 1 through 2 (of 2 total)
  • You must be logged in to reply to this topic.
Page last updated by Broddo on