SAP PM Questions

SAP PM (EAM) QuestionsHere you will find sample SAP PM questions and mock tests for SAP PM certification (also known as SAP EAM certification) that are relatively similar to the original exam. You should definitely use them during preparation for the certification, because it will help you to familiarize yourself with the exam format, test your knowledge, identify areas that require additional attention, and sometimes these sample questions are just a little bit similar to what you might encounter at the real exam.

SAP PM vs SAP EAM Certification

It is a little bit confusing but the certification for SAP PM (Plant Maintenance) module is officially called not SAP PM certification but SAP EAM certification. Don’t be confused by this when booking your exam at the official SAP website or through PearsonVUE.

SAP PM Certification Questions

Before you read these sample questions, it is necessary to make one thing crystal clear: there is absolutely no way to get SAP PM questions that will appear at the actual certification. There are several reasons why it is not possible. First, no one has access to the bank of the certification questions because they are kept in the utmost secrecy. Second, the pool of questions that SAP has is so large that, even if someone could extract some questions from the secret database, the probability of getting these SAP PM questions at the exam is extremely low because the questions are randomly selected by a computer. Therefore, do not believe the people who try to sell you SAP PM questions and promise that after studying them you will definitely pass SAP PM (EAM) certification.

During SAP PM certification you will be required to answer 80 multiple choice questions. There is no negative marking for incorrect answers. It means that you should try to answer as many questions as possible even if you are not sure what is the correct answer. You will be given 180 minutes to complete the certification. The current passing score for SAP PM certification is around 60%.

Free SAP PM Certification Questions

Below are 80 sample questions for SAP PM certification. If you are preparing for the exam, try to answer these SAP PM questions and see how many questions you could answer correctly. Here we also posted answers to these SAP PM questions and brief explanations for each of the questions.

Disclaimer: These sample SAP PM questions are for self-evaluation purposes only and do not appear on the actual certification exams. Answering the sample questions correctly is no guarantee that you will pass the certification exam. However, it is a great way to prepare for the actual certification exams and helped many people to become certified SAP consultants.

In every SAP PM question, except ‘true or false’ questions, at least one or more answers can be correct.

1. Which type of assignment is particularly necessary if individual units of a technical system in your company are identified by a label that describes the position or the unit in the system as a whole? The assignment should also support the transfer or data from superior functional locations to subordinate functional locations even if the generic structure of the location numbers has not been used within the location hierarchy.

Please choose the correct answer

a) Automatic alignment upon creation b) Manual assignment c) Reference functional location d) Copying assignment

2. Assume a scenario where a system engineer accidentally entered a functional location with an incorrect label. How do you correct it without making a new entry?

Please choose the correct answer

a) Alternative Labeling b) Changing the primary key e) Duplicate Labeling d) Hierarchical Labeling

3. In your company individual movable aggregates have a complex structure and the use of functional locations is not supported. What is the alternative option?

Please choose the correct answer

a) Multiple Functional Hierarchy b) Superordinate Hierarchy c) Equipment Hierarchy d) Complex Hierarchy

4. What are the two different types of statuses to describe and ascertain whether or not a technical object is available for particular operations?

Note: More than one correct option

a) Manual status b) Initial Status c) System Status d) User status

5. How do you assign vendor 1000 as the responsible vendor and user USER101 as the responsible user to your piece of equipment E1?

Note: More than one correct answer

a) Goto -> Equipment b) Goto -> Partners c) SAP menu -> Logistics -> Plant Maintenance -> Management of technical objects -> Partners -> Change d) SAP menu -> Logistics -> Plant Maintenance -> Management of technical object -> Equipment -> Change

6. Is it possible to create bill of materials without reference to a plant where the system only checks whether material master records are available and plant specific material checks are not performed? What is this type of BOM?

Please choose the correct answer

a) No, BOM has to be related to only specific plant b) Yes, through Group BOM c) Yes, through Stock BOM d) Yes, through complex BOM

7. Which types of materials are used if you have to track the cash in the Plant Maintenance Information System, but do not require inventory management?

Note: More than one correct option

a) Maintenance assemblies b) Inventory Materials c) Material type IBAU d) Structure Materials

8. Assume a scenario where all objects of the same construction type use the same material BOM and you want to avoid creating equipment BOM for each individual object. Which type of assignment do you prefer?

Please choose the correct answer

a) Direct assignment b) Indirect assignment c) Sub ordinate assignment d) Individual assignment

9. In general if you enter a material that already has a serial number profile for the serialization of individual pieces of equipment in the equipment master record, the system displays the last serial number assigned for this material (if a serial number was already assigned). But where do you perform the actual assignment?

Please choose the correct answer

a) Equipment master record b) Material master record c) Serial record d) Transaction SERZ

10. When goods are moved, the fields relevant for the stock are checked. After the movement the serial number is updated with the current stock data from the inventory management. What happens when the data does not correspond during the movement?

Note: More than one correct option

a) The movement is prohibited b) Allowed c) Allowed with a warning d) Depends on Customizing

11. Which type of preventive maintenance enables you to plan maintenance based on counter reading that are managed for the technical objects to be maintained?

Please choose the correct answer

a) Process control maintenance b) Control maintenance c) Performance-based preventive maintenance d) Data-based preventive maintenance

12. Which of the following measurement transfers are possible?

Note: More than one correct option

a) Measurement transfer from n measuring point to another (n:1) b) Measurement transfer from one measuring point to a number of others (1: n relationship) c) Counter reading transfer from one counter to another (1:1 relationship) d) Counter reading transfer hem one counter to a number of others (1:n relationship)

13. Assume a scenario where you entered a measurement document on 01.05. This has been transferred to equipment P-1000 using the functional location hierarchy. On 17.05, you enter the equipment P-1000 is replaced by equipment P-2000 with a historical reference data 22.04. What happens to the measurement document for equipment P-1000 and P-2000?

Note: More than one correct is option

a) The measurement document for equipment P-1000 is deleted since this had not yet been installed when the measurement document was created on 01.05. b) The measurement document for equipment P-2000 is generated since this has already been installed when the measurement document was created. c) The measurement document for equipment P-1000 and P-2000 will not be generated d) The measurement document for equipment P-1000 and P-2000 will be generated

14. Which types of task list are object-based and created for a specific, individual piece of equipment?

Please choose the correct answer

a) Task lists for functional locations b) General maintenance task lists c) Equipment task list d) Preventive task list

15. How do you assign stock materials which are not listed in the bill of materials for the maintenance object, directly in the maintenance task list?

Please choose the correct answer

a) Complex material assignment b) Multiple material assignments c) Task list assignment d) Free material assignment

16. You want to determine the costs for equipment task lists and functional location task lists. Can you run the cost analysis program for both task lists types at once?

Please choose the correct answer

a) You can run the cost analysis program for both task list types at once b) You can only execute the cost analysis program for one task list type at once c) Yes but result will not be accurate d) Only for external processing operations

17. How do you generate short orders without a task list if no task has been entered in the maintenance item for the maintenance plan?

Please choose the correct answer

a) The system copies the short text for the maintenance plan into the maintenance order as an operation description b) The task list has to be entered compulsorily c) Task list is generated but the planner cannot add additional operations to the maintenance order d) This leads to errors in scheduling data

18. What status will be set in the maintenance plan if you use the deactivate function to block maintenance plans for a certain period of time?

Please choose the correct answer

a) IAKN b) INAK c) IKNK d) IKAA

19. What happens if no scheduling period is defined in the maintenance plan when the current waiting call is converted into an order?

Please choose the correct answer

a) Order will not be processed b) Order is blocked c) A new planned date is automatically added d) Previous scheduling date will be entered

20. Which modification factor can be used to change the cycle times for a maintenance strategy individually for each maintenance plan?

Please choose the correct answer

a) Factory Calendar b) Scheduling Period c) Cycle start d) Cycle modification factor

21. Which task list do you prefer if you have to group operations for objects that are only slightly different?

Please choose the correct answer

a) Single Task list b) Combined Task list c) Detailed Task list d) Configurable Task list

22. In which case the active maintenance dates during the period in question are used for the cost estimate?

Note: More than one correct option

a) Object-related cost estimate b) General costing c) Average costing d) Moving average costing

23. Which profile does the system use to determine at which times and over which time period certain tasks must be performed for this notification?

Note: More than one correct option

a) Response Profile b) Task Profile c) Service Profile d) Priority

24. How do you notify an external company automatically (for example, by automatic fax or email) when the service entry sheet is called?

Please choose the correct answer

a) MM Messaging b) MQ Messaging c) MS Messaging d) ME Messaging

25. Which of the following determines the maintenance package will be performed if two maintenance packages are due at the same time?

Please choose the correct answer

a) Cycle Length b) Offset c) Hierarchy d) Initial Buffer

26. Which type of task list can be used with engineering change management?

Note: More than one correct option

a) Service b) Object c) Maintenance d) Time

27. How do you extend or shorten the maintenance cycle for example to react to temporarily additional requirements without changing the maintenance strategy?

Choose the correct answer

a) Control parameter b) Maintenance parameter c) Cycle modification factor d) Maintenance plan

28. Which of the following helps in the calculation of maintenance dates which have to be adjusted automatically based on counter readings for planning preventive maintenance?

Note: More than one correct option

a) Counters b) Measures c) Characteristic d) Norms

29. Which type of maintenance plans must be configured so that right maintenance date is calculated to match the actual running performance?

Please choose the correct answer

a) Time based b) Cost based c) Performance based d) Manual Plans

30. In performance-based maintenance plans which of the following user exit can you use to determine (according to your own rules) which maintenance package will next fall due, dependent upon the previous counter reading?

Please choose the correct answer

a) IPRM003 b) IPRM004 c) IPRM005 d) IPRM006

31. What is the maximum number of time-based cycles that can be used in a multiple counter plan?

Please choose the correct answer

a) Two b) Three c) Zero d) One

32. Which of the following parameter in multiple counter plan defines the call date for the order in relation to the calculated planned date and thereby also the basic start date for the maintenance order?

Please choose the correct answer

a) Operation type b) Scheduling period c) Cycle modification factor d) Preliminary buffer

33. Which type of task list enables you to group operations for objects that are only slightly different?

Please choose the correct answer

a) Configurable task list b) Clarification task list c) Dependency talk list d) Object task list

34. The vehicle is to undergo a small inspection after 15000 kilometers and/or one year. After another 15000 kilometers and/or two years a major inspection is to be carried out. You used a multiple counter plan and defined two cycle sets for this with the cycles stated. You assign each cycle set (for example cycle set 1 and cycle set 2) to a maintenance item. One maintenance item contains the small inspection, the other the major inspection. How can you define how often a cycle set is used in a sequence to calculate a date before the system switches to the next cycle set?

Please choose the correct answer

a) Cycle time b) Repeat factor c) Cycle set d) Cycle sequence

35. In service contract where do you specify the technical objects like functional locations, pieces of equipment or serial numbers at which services are performed?

Please choose the correct answer

a) Contract header b) Contract Maintenance c) Contract item d) Maintenance item

36. When a maintenance plan is created with reference to a contract item, the system automatically copies certain data into the maintenance plan. The start date is proposed from which of the following?

Please choose the correct answer

a) General task list b) Object task list c) Contract header d) Contract item

37. In which table can you find information whether users are allowed to switch between the SAP menu and their user menus?

Please choose the correct answer

a) USERS_PPM b) USERS_mit c) USERS_SSM d) USERS_PMM

38. While using F4 help what is the default value for the maximum number of hits displayed?

Please choose the correct answer

a) 500 b) 1000 c) 2000 d) 100

39. In the main of a technical system which tasks comprises determining the actual condition and restoring the target condition.

Note: More than one correct option

a) Inspection b) Maintenance c) Repair d) Restore

40. In SAP Net Weaver, how do you offer users with the possibility of providing the respective user with a customized application menu that includes precisely the transactions that are needed for his daily work?

Please choose the correct answer

a) Menus b) Profiles c) Roles d) Views

41. Which of the following function of the work center can be used to determine the dates when operations should he performed?

Please choose the correct answer

a) Costing b) Capacity planning c) Timing d) Scheduling

42. How do you map more complex technical systems, equipment to map individual objects, and maintenance bills of material to map spare parts?

Please choose the correct answer

a) Structuring b) Mapping c) Functional locations d) Classification

43. How do u map individual single objects that could be part of bigger technical structures or independent and for which a separate maintenance history should he constructed?

Please choose the correct answer

a) Customer devices b) Equipment c) Maintenance units d) Single objects

44. In which phase of corrective maintenance does the orders runs through different checks such as material availability checks and capacity planning which are important for the release of the order?

Please choose the correct answer

a) Notification b) Execution c) Control d) Planning

45. Which type of permits are determined automatically based on a field in the order header and can likewise influence the order release?

Please choose the correct answer

a) Process-oriented permit b) Technical permit c) Welding permit d) Planned permit

46. Which of the following scheduling parameter in multiple counter plans defines that the current call object must be completed before a new one is generated?

Please choose the correct answer

a) Completion requirement b) Scheduling period c) Operation type d) Preliminary buffer

47. In contrast to the performance-based strategy plan, when you schedule the multiple counter plans, no high numbers of cycles occur for determining the new planned date. Instead, scheduling is always calculated from which readings?

Please choose the correct answer

a) Current counter readings b) Previous counter readings c) Old counter readings d) Period-based counter mailings

48. To assign material components to a general maintenance task list, you must first enter the following in the general task list header?

Please choose the correct answer

a) Assembly b) Maintenance components c) Maintenance B0M d) Maintenance list

49. What will you do if the components that you want to assign to an equipment task list or functional task list are not available in the respective bill of material when the assignment is made? Does the system automatically add the freely assigned material to the bill of material?

Note: More than one correct option

a) You can assign stock material freely b) You cannot assign stock material freely c) The system does not automatically add the freely assigned material to the bill of material of material d) The system automatically adds the freely assigned material to the bill of material of material

50. In which type of relationship the start of one operation is linked to the end of the following operation?

Please choose the correct answer

a) FS relationship b) SS relationship c) FF relationship d) SF relationship

51. In which selection procedure of task list all the task lists, which have been created for the objects that are sub-objects of the reference object are selected?

Please choose the correct answer

a) General task list b) Sub-object task list c) For assembly d) For object structure

52. When a configurable task list is included in an order, operations are selected on the basis of characteristics. Operations use objects dependencies and these object dependencies are a combination of?

Note: More than one correct answer

a) Characteristics b) Task lists c) Configurable tasks d) Values

53. How do you cover some objects that are maintained in a fixed cycle determined by a standard?

Please choose the correct answer

a) Object maintenance planning b) Fixed cycle maintenance planning c) Single cycle maintenance planning d) Scheduled maintenance planning

54. Which of the following can be used for time-based and performance-based preventive maintenance?

Please choose the correct answer

a) Time-based period b) Scheduling period c) Order period d) Maintenance period

55. In general we use call horizon scheduling parameter to define when the order is actually generated compared to the planned date. 0% of the cycle would mean?

Please choose the correct answer

a) Cycle is generated exactly on the planned date b) Order is generated when the maintenance plan is started c) Generation of the order would occur abler 81 days d) The maintenance plan is not scheduled

56. How do you process the maintenance of a technical system which consists of system parts with different maintenance cycles, should be processed within an order, this can be performed?

Note: More than one correct option

a) Work list of items b) Maintenance order c) Notifications d) Work order

57. In which customizing option for the order type do you define whether the system should automatically release the maintenance order when it is generated?

Please choose the correct answer

a) Default order type for maintenance item b) Adapt order type c) Maintenance plan category d) Completion date

58. How do you calculate the daily performance of performance-based maintenance plan?

Please choose the correct answer

a) Daily performance b) Weekly performance c) Annual performance d) Planned counter

59. In which plan can you assign cycle with different dimensions?

Please choose the correct answer

a) Single counter plan b) Annual counter plan c) Multiple counter plan d) Reference counter plan

60. Which of the following factors is set in customizing and represents the link between PM and QM?

Please choose the correct answer

a) Inspection lot b) Order type c) Deadline monitoring d) Scheduling parameters

61. What are the two functions to monitor maintenance plans regularly using deadline monitoring?

Note: More than one correct option

a) Rescheduling b) Calling up orders/notifications/service entry sheets c) Planned dates d) Scheduling cycles

62. Which of the following class type is recommended by SAP as a prerequisite for creating configurable task lists?

Please choose the correct answer

a) Class type 100 b) Class type 001 c) Class type 300 d) Class type 500

63. Which type of lists allows you to use a filter to activate or deactivate different objects like notifications, orders and measuring points?

Please choose the correct answer

a) Single list b) Serial Number Lists c) Multilevel Lists d) Technical Lists

64. Which type of lists allows you to select entries based on header data and operation data?

Note: More than one correct option

a) Serial Lists b) Order Lists c) Operation Lists d) CO reports for orders

65. Which type of integrated application in Online Transaction Processing contains large quantities of master and process data which is then presented in information systems in a clear and user-friendly manner?

Please choose the correct answer

a) Operational integrated applications b) Technical integrated applications c) Multilevel integrated applications d. Complex integrated applications

66. Which of the following organizational elements are used as characteristics in info structures?

Note: More than one correct option

a) Location b) Plant section c) Maintenance Planner d) Storage Location

67. Which of the following info structure contains characteristics order type, Maintenance activity types, Functional location Equipment and Month?

Please choose the correct answer

a) S112 b) S113 c) S114 d) S115

68. Identify the object for which you cannot link a work center?

Please choose the correct answer

a) With a cost center b) With company code c) With qualifications d) With positions

69. Which strategy do you follow if you want to analyze what effects the usage conditions have on the likelihood of damage to the installed equipment?

Please choose the correct answer

a) Organizational units b) Maintenance tasks c) Functional locations d) Monitoring areas

70. Which data is useful to monitor a piece of equipment dynamically that is track changes to the equipment over a specific period of time?

Please choose the correct answer

a) Period-based data b) Equipment data c) Time segment d) Time-based data

71. What are the prerequisites that must be fulfilled for a piece of equipment to be installed at a functional location?

Note: More than one correct option

a) The equipment category must permit an installation b) Individual installation option activated in the master record for functional location c) Equipment installation allowed must be activated in the master record for functional location d) Restrict equipment installation allowed option

72. Where can you find documentation related to the work performed for a notification?

Please choose the correct answer

a) Activities b) Tasks c) Work item d) Items

73. After the maintenance order obtained the status TECO after the maintenance work required for the order has been completed. The maintenance order can he changed online as follows:

Note: More than one correction option

a) The deletion flag cannot be set b) It can be locked or unlocked c) You can still change the settlement rule d) You cannot change the settlement rule

74. How does maintenance bill of material differs from other BOMs and identify the functions that is related to maintenance bill of materials?

Note: More than one correct option

a) It contains items relevant to Plant Maintenance b) It contains items relevant for Company Maintenance c) Structuring of the object d) Spare parts planning in the order

75. Which type of maintenance the creation and release of the maintenance order in one work step after a malfunction has been reported for example by an employee in production?

Please choose the correct answer

a) Preventive Maintenance b) Breakdown Maintenance c) Maintenance Planner d) Technical Maintenance

76. Which of the following instruments available for processing maintenance tasks are used to convey maintenance requirements and the documentation for technical findings and activities performed?

Please choose the correct answer

a) Orders b) Deliveries c) Maintenance Plan d) Notifications

77. When a maintenance plan is created with reference to a contract item, the system automatically copies certain data into the maintenance plan. The start date is proposed from which of the following?

Please choose the correct answer

a) General task list b) Object task list c) Contract header d) Contract item

78. What do you call a combination of code groups grouped together by their content for example damages, causes of damages?

Please choose the correct answer

a) Catalog b) Code groups c) Codes d) Groups

79. What are the two different views that plant maintenance order offers with regards to the work environment for the planner?

Note: More than one correct option

a) The expert view b) Internal processing view c) Customizing view d) The simple order view

80. Which element of the maintenance order contains span parts, which are required and used when the maintenance order is executed?

Please choose the correct answer

a) Object list b) Header data c) Order operation d) Material list

Answers and Explanations for SAP PM Questions

For seeing answers and explanations for 80 SAP PM questions published above, please visit this page: Answers to SAP PM Questions.

Page last updated by Cleo Isco on

6 thoughts on “SAP PM Questions”

  1. Most of these questions need to be written again so a normal person can understand them. They are written in broken English and its confusing to try to understand what is being asked.