14. Which item category group will explode material BOM’s in the sales order?
- NORM
- ERLA
- LUMF
15. A bill of material (BOM) can be used with free goods process.
- True
- False
16. A text item in a sales order will always have a schedule line.
- True
- False
17. Which of the following functions will be controlled by the schedule line category?
- Goods movement type
- Delivery relevance and availability checks
- Purchasing
- Billing relevance
- Pricing
18. The schedule line category is determined from which objects. Select the correct answer.
- Document type + MRP type
- Item category + MRP type
- Item usage + MRP type
- Item usage + item category group
19. Delivery scheduling will first take place backwards to determine material availability date. If the material is not available on the required availability date or in the past the system will then use forward scheduling.
- True
- False
20. Copy control contains the rules for data flow between documents. Copy control is set up for relevant relationships between document types, item categories and schedule lines. Pre requisites are: requirements, copy routines and document flow.
- True
- False