cost allocation to a production order

Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • #22272
    Anonymous
    Inactive

    In the ERProof “SAP Cost Allocation” tutorial, in the “SAP Cost Allocation Method – Assessment” section it indicates that you want to move a cost from a production cost center to a related production order, but it appears later that it is actually moving the cost to a different cost center. Is it possible to allocate a cost from a cost center to a production order? To which cost objects is it possible to allocate costs?

    #23058
    Edward T
    Participant

    Hi,

    in Prod order there are 2 possibilities based on your configuration.
    1. Production Order Linked to Product Cost Collector, means yo want collect the costs by product rather than by production. Usually use in repetitive mfg, where settlement will done periodically.
    2. Production Orders as Cost Objects in Product Cost by Order, means all cost happen in production will calculate per order, and letter need to settle. usually used in discrete mfg..

Viewing 2 posts - 1 through 2 (of 2 total)
  • You must be logged in to reply to this topic.